Stage 3 – More removal ( and new pipes & lines ) 24 Sep 2016 By basszje On 24 September 2016 In Huiselijke zaken, Ukraine When I thought all the destruction was done, they found our floor. It was covered with +/- 7 cm of concrete that needed to go. Poor neighbours. There are also fresh electricity cables not, and CAT 6A. Related Posts Stage 1 – Removing Wallpaper